The project
Built in 1981 along the Oglio river in Capriolo municipality (Brescia province), it’s most likely the first example of application of hydraulic actuated flap gates on a weir. This system allows to regulate the upstream water level and it can totally close during floods.
The dimensions of the movable elements – 4 spans of 20 m each with a retaining height of the movable part of 1 m – and the possibility of precise adjustment of the hydraulic system made it an example that has been replicated in the following years, almost becoming a standard for mobile weirs.