The project
Many years ago, in Italy, the hydropower potential had already been almost totally exploited, so Frosio Next team studied and applied new hydropower solutions: the exploitation of heads across weirs, even existing ones, for energy production. The first studies and applications date back to 2010 and they are still in progress.
On one hand these applications are linked to undoubted benefits related to the use of existing works, with relatively low investments and a particularly rewarding incentive system, but on the other hand the design of these systems is particularly difficult due to several existing constraints such as the need (imposed by the legislation) to discharge at the weir foot and the low water levels upstream.
The proposed solutions which were pioneering at the time, have now become the standard for this type of plant which is increasingly common along our rivers.
Our projects
Contact us
Do you want to start a great project with us?
Fill the form and get in touch with us.