The project

FROSIO NEXT performed the design of two cascade run-off-river type hydropower plants along Roshka river, in Mtskheta-Mtianeti region, in Georgia.
The SHPP Roshka 2 is located upstream and the design discharge was set at 1,7 m3/s. It will be diverted from the Roskha river at an elevation of about 1750 m a.s.l.. An approximately 1,4 km long penstock will convey the water from the intake to the powerhouse. The powerhouse will host a single production unit equipped with an horizontal axis cross-flow turbine. After passing through the turbine, the water will be discharged in Roshka river. Immediatly downstream, Roshka 3 hydropower plant is located. The design discharge was set at 1,4 m3/s. It will be diverted from the Roskha river at an elevation of about 1560 m a.s.l.; an approximately 1 km long penstock will convey the water from the intake to the powerhouse. In the powerhouse, a single production unit equipped with an horizontal axis cross-flow turbine will be installed.

progettazione impianti idroelettrici cascata Roshka frosio next
PROJECT’S FEATURES
DURATION

2020

LOCATION

Mtskheta-Mtianeti, Georgia

CLIENT

Parvus Hydro LTD

ASSIGNMENT

Site survey, basic design, reinforcement construction drawings, technical specifications (civil and hydromechanical works)

NAME OF THE PLANT

Roshka 2 and Roshka 3 hydropower plants

MAIN DATA OF THE PLANT
INSTALLED CAPACITY

2 MW

NOMINAL HEAD

148 m

MAXIMUM DISCHARGE

1,7 m3/s

progettazione impianti idroelettrici cascata Roshka frosio next -2
progettazione impianti idroelettrici cascata Roshka frosio next -3
progettazione impianti idroelettrici cascata Roshka frosio next -4

Our projects

Contact us

Do you want to start a great project with us?
Fill the form and get in touch with us.

I hereby acknowledge that I have read and understood the privacy policy of Frosio Next S.r.l..
I hereby authorize the use of my personal data for marketing puropses.