New Maroggia hydropower plant
The project
Between 1996 and 1998, Frosio Next was involved in the realization of the new hydropower plant of Maroggia, dealing with the design and the work supervision of the penstock, the electromechanical equipment and the powerhouse building. In particular, the following activities were carried out:
- for penstock: construction design, technical specifications, assistance during tender and work supervision
- for electromechanical equipment: technical specifications and assistance during tender
- for the powerhouse building: structural design, structural work supervision and assistance during test and commissioning
Frosio Next contribution
In 1996 the Frosio Next team was entrusted with the revision of the original project and the construction design of the penstock. It also followed the subsequent construction phase as work supervisior.
In addition, as electromechanical expert, Frosio Next also took care of the electromechanical equipment elaborating the related technical specifications and providing assistance during tender.
Finally, Frosio Next provided the structural design of the powerhouse building and the structural work supervision during the construction phase.
Find out other works we performed on the plant!
1996 – 1998
Berbenno di Valtellina (Sondrio province), Italy
E. Boselli & C. S.p.A.
Penstock: construction design, technical specifications, assistance during tender and work supervision
Electromechanical equipment: technical specifications and assistence during tender
Powerhouse building: structural design, structural work supervision and assistance during test and commissioning
New Maroggia hydropower plant
1400 kW
814,50 m
0,20 m3/s
0,125 m3/s