Shatili hydropower plant

The project

FROSIO NEXT performed the design of Shatili hydropower plant in Mtskheta-Mtianeti region, in Georgia. The design included hydraulic, static and structural computations of the plant’s components: intake, penstock and powerhouse. The intake will consists of a Tyrolean weir. It will be diverted from the Arghuni river at an elevation of about 1,567 m a.s.l.. Water is conveied from the intake to the forebay made up of carpentry. An approximately 1.4 km long penstock will convey the water from the forebay to the powerhouse. The powerhouse elevation is about 70 m lower than the intake elevation.
All civil works have been designed in order to minimize their interference with respect to floods. Concerning the electromechanical supply, the choice fell on a Banki turbine, which is well suited for installation in remote sites due to the low need of maintenance.

impianto idroelettrico Shatili frosio next -1
PROJECT’S FEATURES
DURATION

2020

LOCATION

Mtskheta-Mtianeti, Georgia

CLIENT

Parvus Hydro LTD

ASSIGNMENT

Site’s visit, basic design (drawings, bill of quantities, calculation report, technical specifications), reinforcement construction drawings

NAME OF THE PLANT

Shatili hydropower plant

MAIN DATA OF THE PLANT
INSTALLED CAPACITY

0.2 MW

NOMINAL HEAD

69 m

MAXIMUM DISCHARGE

0,400 m3/s

impianto idroelettrico Shatili frosio next -2
impianto idroelettrico Shatili frosio next -3
impianto idroelettrico Shatili frosio next -4

Our projects

Contact us

Do you want to start a great project with us?
Fill the form and get in touch with us.

I hereby acknowledge that I have read and understood the privacy policy of Frosio Next S.r.l..
I hereby authorize the use of my personal data for marketing puropses.