Due diligence of Ronchi hydropower plant

The project

With the aim of providing the client with all the elements to evaluate the potential acquisition of Ronchi hydropower plant, FROSIO NEXT carried out the due diligence of the plant.

In particular, FROSIO NEXT pefromed the following activities:

Technical part:

  • Analysis of the available technical documentation provided by the client
  • Visit to the plant
  • Analysis of the reliability and completeness of the technical input data (hydrology, geology, topography)
  • Analysis of the production and of the annual electricity generation
  • Identification of the main technical-executive issues
  • Evaluation of the potential improvements and relative costs
  • Analysis of the operating costs

Administrative part:

  • Analysis of the technical and administrative documentation
  • Analysis of water concession, the analysis of the authorization path and of the PPA.
  • Analysis of the decrees and of the PPA
  • Analysis of the general authorization documentation
due diligence impianto idroelettrico Ronchi frosio next -1
PROJECT’S FEATURES
DURATION

2020

LOCATION

Cuneo (CN), Italy

CLIENT

Idroelettriche Riunite SpA

ASSIGNMENT

Due Diligence

NAME OF THE PLANT

Ronchi hydropower plant

MAIN DATA OF THE PLANT
INSTALLED CAPACITY

0.336 MW

NOMINAL HEAD

39 m

MAXIMUM DISCHARGE

1,9 m3/s

due diligence impianto idroelettrico Ronchi frosio next -2
due diligence impianto idroelettrico Ronchi frosio next -3
due diligence impianto idroelettrico Ronchi frosio next -4

Our projects

Contact us

Do you want to start a great project with us?
Fill the form and get in touch with us.

I hereby acknowledge that I have read and understood the privacy policy of Frosio Next S.r.l..
I hereby authorize the use of my personal data for marketing puropses.